top of page
IMG_1533.jpg

Project Highlights

Ulu Jerai Hydroelectric Dam, Cameron Highlands

Ulu Jerai Hydroelectric Project is located in the state of Pahang, in the district of the Cameron Highlands about 140km north of Kuala Lumpur.
 

The main component of the project is the “Susu Dam” on the Bertam river. The dam, over 80m high has a volume of 800,000 cubic metres of RCC (roller compacted concrete), one of the most advance technologies used in dam construction.


Other main features include an underground powerhouse, 2 Francis turbines – each of 191 MW – and 26km of tunnels, which is excavated mainly by TBM. The installed capacity of the project is 382 MW.

COUNTRY :

Malaysia

LOCATION :

Cameron Highlands, Pahang

CLIENT :

OUR SCOPE OF WORKS:

Mainly rental of heavy equipment including hydraulic excavators, bulldozers, tipper trucks, vibratory rollers and other supporting machineries.

 

Rental includes skilled operators and experienced site supervisors to assist with the major earthworks in the project.

TM - Salini Consortium

VALUE :

RM 18 million

DURATION :

2011 - 2014

bottom of page